EPC and Sub-EPC services for wind power, solar power and BESS projects across Europe, MENAT and CIS countries.
Call Us
Send Email
Head Office
For wind power plants that require precise logistics and advanced engineering planning in challenging geographical conditions, we manage all on-site processes from roadworks to foundations with the rigor and responsibility of a main contractor.
Helios is currently executing 232.4 MWm of wind infrastructure in Europe. At Tulucesti-Foltesti (162.4 MWm, Romania) for Alerion Clean Energy, the scope covers comprehensive civil infrastructure, access roads, crane pads and reinforced concrete turbine foundations; at Kremena-Trigortsi (70 MWm, Bulgaria) for United Group, it spans heavy civil engineering works, specialized earthworks, logistics corridor preparation and structural turbine foundations.
Civil Works: Access roads, foundations, crane pads and hardstand areas, pile works, substation construction and control buildings.
Heavy Terrain Capability: We have carved kilometers of access roads through impenetrable terrains and engineered large-scale crane platforms under extreme site conditions.
Single Point of Responsibility: As a Main Civil Works Contractor, we offer investors a single point of responsibility from survey to turnkey delivery.